Life

hub-logo-white

middle-header-life2

sydenhamcrane

-by Khrys Timmerman

The wet and soggy weather has produced a bumper crop of mud! Our brave concrete workers continue to form and pour for the Lower Level of the building at The Sydenham with an extra 20lbs added to their boots! Rowland Concrete continues to form, strip, and form pile caps throughout the site while the guys from AGF mudAlbrecht install rebar. Harold Sutherland is supplying the concrete and pumper. Underwood Construction is providing excavating services as piles are dug out for forming and then backfilled after the forms arestripped. Local engineering firm WSP Canada Inc. is providing testing and inspection services. Almost every part of the site is active as the team moves through.

For more information about the nine remaining available residences, please call 866-353-8181 or email [email protected].

Hub-Bottom-Tagline

CopyRight ©2015, ©2016, ©2017 of Hub Content
is held by content creators